The requirements for pipe material and installation in sewer and drainage collection systems. Stagger tests to ensure consistent compactive effort has been achieved. 1 (do not test 1st lift) = 2) = 14 tests required per 300 (Answer) Pipe Testing Frequency Example 2: Pipe Diameter = 36 in. If the inspection is conducted by video: The video camera must have fully articulated lenses (360 degree inspection). The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. small voids and is compact. Pipe openings in precast drainage units shall not exceed the outside cross sectional dimensions of the pipes by more than a total of 8 inches regardless of the placement of the pipe, their angles of intersection, or shapes of the pipes. Grades and certifications are issued within 15-30 business days after the testing date. SUBDRAINS AND FOOTING DRAIN COLLECTORS. VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions. 2016v1.0 Chapter 4 17, 18 8) At the end of the run ( feet) a 45 degree elbow is used to connect the longitudinal pipe to the non perforated outlet pipe to force the collected water to discharge. hYoF#4rPzL@]Gb)3d@pa@sc/IK^0@Qq. Refer to VDOT Road and Bridge Specifications, Section Procedures (d) Post Installation Inspection for detail requirements and remediation procedures. 155 0 obj <>stream If the mandrel test is to be performed to mechanically measure deformations/deflections of the pipe/culvert, the mandrel used shall be a nine (or greater odd number) arm mandrel, and shall be sized and inspected by the Engineer prior to testing. 4 in.) Screen the sample over a 3/4-inch sieve and replace the aggregate retained with an equal weight of No. When backfill is below spring line of pipe, compact next to pipe first and work towards the trench wall. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, APD Instructional and Informational Memoranda, Minimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, AASHTOWare Project Preconstruction (AWP-P) Manual, Construction Instructional and Informational Memoranda, Instructional and Informational Memoranda, Alternative Intersection Informational Design Guides, LD Instructional and Informational Memoranda, PMO Instructional and Informational Memoranda, Pollution Prevention Field Guide for Construction Activities, Roadside Development Report Excel spreadsheet tool, Nutrient Management Plan for Construction Projects, Nutrient Management Plan for Roadside Management, VDOT BMP Maintenance Manual Appendix C - Plant Palette Tables, Materials Certification School Information, Guide to the Traffic Impact Analysis Regulations, Land Development Inspection Documentation Best Practices Manual, OD Instructional and Informational Memoranda, Guide Manual for Causes and Repair of Cracks in Bridge Deck, Traffic Calming Guide for Neighborhood Streets, Manual on Uniform Traffic Control Devices (MUTCD), TED Instructional and Informational Memoranda, VDOT Traffic Operations and Safety Analysis Manual (TOSAM), Instructional and informational memoranda, Manual for the Procurement and Management of Professional Services. ACI Concrete. The side is called the drainage side. Soil Compaction Handbook ff Soil Compaction Soil compaction is defined as the method of mechanically increasing the density of soil. The fill above the top of the regular backfill shall be installed and completed as specified for embankment construction. 142 0 obj <>/Filter/FlateDecode/ID[<40D256C358E2674187D5A8FC321FC95C>]/Index[129 27]/Info 128 0 R/Length 70/Prev 587873/Root 130 0 R/Size 156/Type/XRef/W[1 2 1]>>stream Importance to Maintenance & Water Quality. All rights reserved. If the soils is 100 percent saturated and the voids are full of water and has a high MC. A copy of the Storm Sewer/Culvert Inspection Report (inspection report)including any video tape/digital Video Recording (DVD)/digital photographs shall be provided to the VDOT Inspector within two business days of the completion of the inspection and made part of the project records. Currently VDOT certified or Mid Atlantic Regional Technician Program (MARTCP) in the following disciplines: - Expected VDOT Certifications Soil and Aggregate Field Compaction Asphalt Field Hydraulic Cement Concrete Field Pavement Marking Flagger Certification Certification & Issuing Agency Soil and Aggregate Compaction - VDOT or NICET LEVEL II* Some links may require the Adobe Reader. 13) What is the maximum allowed crack size of a rigid pipe? By using this site you agree to our use of cookies as described in our, You have been successfully registered in pdfFiller, VDOTSoilsandAggregateCompaction 3 CONSTRUCTIONANDACCEPTANCETESTING OFSUBGRADEMATERIAL LEARNINGOUTCOMES Understandtheimportanceofsubgradeandthedifferenttypesofsubgradematerial Understandthevarioustypesandmethodsofmechanicalandchemicalstabilization, VisitingProfessorofLaw,StanfordLawSchool(Winter;Spring2013);InezMilhol. 1. Download Free PDF. 16) In the case of UD 7, as asphalt concrete cap is used to complete the backfilling and provide the final surface that is even with the shoulder. 2) 108 in. The gradation is the distribution of various particle sizes within the material. = 15 lifts 5) 15 ifts 2 (one test every other lift) = 7.5, round up to 8 tests in the top 5 ft. of backfill 6) Total tests required = (Number of test below 5 ft.) + (Number of test above 5 ft.) 7) = 11 tests required (minimum) NOTE: Compaction Tests are required on stone backfill (Class I backfill and bedding material); consult the District Materials Division for Maximum Dry Density and Optimum Moisture Content targets for the specific material being used. Importance to Maintenance & Water Quality. Locate Utilities Prior to excavating the trench area, all utilities should be located by a qualified contractor. The foundation is to be explored below the bottom of the excavation to determine the type and condition of the foundation. Other sets by this creator. Soils & Aggregate CCWA $ 350.00 $ 250.00 Handson proficiency will be scheduled upon . Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS, DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL, SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS, San Antonio Water System Standard Specifications for Construction ITEM NO. Figure 4.1: Precast Concrete Pipe 2016v1.0 Chapter 4 1, 2 BASIC PIPE AND SOIL CONCEPTS The type of pipe selected for a particular application depends on many factors. endobj 295 0 obj <>/Filter/FlateDecode/ID[<8B56AE6A42E26944BC3979D310C9B904>]/Index[282 27]/Info 281 0 R/Length 72/Prev 509365/Root 283 0 R/Size 309/Type/XRef/W[1 2 1]>>stream 4 in. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including, BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. STORM SEWER CALCULATIONS 7-4 7.6. STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES. This course is based on ASTM D6938-17a1 Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth). - 2000, Related Features If you have questions, please provide us with the course title and number when e-mailing or calling. Please click on the course title to see the full course description. 16) What is the level of compaction required for pipe backfill? Please check your spelling or try another term. 11) Backfill depth is at least equal to the diameter of the pipe. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix C | 5 Fine particles are more sensitive to the presence of water than coarse particles. If the inspection is conducted manually, the person performing the inspection may use a standard video camera or a digital camera to document any observed deficiencies. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix D | 1 We developed this course with the input of 30-year inspection managers, engineers, and other industry experts. What is the minimum number of density tests that should be run on the backfill material? VDOT Soils and Aggregate Compaction: Chapter 3. 12) How long after installation is complete can the video inspection can be done? Additional temporary fill is needed to protect the pipe from construction loads. Virginia Department of Transportation documents: Road and Bridge Specifications and appropriate supplemental specifications Virginia Test Methods Manual Road and Bridge Standards. 3 0 obj Inspect how the pipe is being stored on site to ensure no damage is being done to the pipe prior to installation. hb```f``2f`@( Table of Contents I. Iowa DOT Information a. protection. CATCH BASINS 7-3 7.4. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall, Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. endobj If you are currently participating in VDOT's Materials Certification Schools, you can access your Materials CertificationReports via the VDOT University Virtual Campus: VDOT University Virtual Campus Users connect at: https://VirtualCampus.VDOT.Virginia.gov . JnqYj A"@. 0 vdot soils and aggregate certification 1 (do not test 1st lift) = 4) = 11 tests required per 300 5) Length of run = 856 ft.; therefore 3 sets of tests required 6) 11 x 3 = 33 tests required for total run (minimum) (Answer) 2016v1.0 Chapter 4 13, 14 Backfill around Drop Inlets (minimum) One test every other lift around the perimeter; beginning after the first 4 inch compacted lift above the bedding and continue to the top of the structure. Pipe should be stored in an out of the way location where it will not be damaged. 2016v1.0 Chapter 4 4, 5 PRE CONSTRUCTION ISSUES Prior to construction the pipe delivered to the project should be inspected and verified to be the pipe specified for the project. 57 stone MUST be capped with a minimum of 4 crusher run prior to placement of pipe or box culvert. Single Offset: This joint first appeared in the early 1990 s. This style of spigot is much easier to manufacture. We also encourage you to contactJ. R. Noble at james.noble@vdot.virginia.gov to sign up for the MCS Managers report, which is offered to help you better track and manage progress throughout the year. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth. Applications for a zoning district map amendment (rezoning), conditional rezoning, planned development, or conditional use permit shall include a VDOT traffic impact statement (VTIS), and applications for a site plan or preliminary plat shall include a traffic impact statement (TIS), where the proposed development is reasonably anticipated to . It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. container, large spoon, and 1.1 lbs. A trench at the edge of the pavement provides a cavity with the least resistance for water to flow and accommodate pavement drainage. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix E | 9 For information on the VECAT program, contact Caroline Fahed, 804-288-3169. Schedule PH (Form 1120) (1960). 4 to 3/4 in. If it is a routine entrance, or crossover pipe 12 to 30 in diameter, that is to be installed under fills 15 feet or less in height, no exploration is needed. Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. bored but can't be bothered to do anything. Installation PowerPoint for Grasscrete Formers, Specifications for Residential Property Owners Connection to New Public Sewer, DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES, SECTION 200: STORM SEWER CONSTRUCTION STANDARDS, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. No additional payment will be made for the repair or replacement of existing concrete damaged, ITEM NO. 5.01 Design, PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO), TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe. This site uses cookies to enhance site navigation and personalize your experience. In a rigid pipe, this zone has zero effect on the load carrying capacity. Heavily compacted soils contain few large pores, less total pore volume and, consequently, a greater density. 10) Backfill the trench using clean #8 or #57 aggregate as soon as practical, but not later than the end of each working day. Get the free VDOT Soils and Aggregate Compaction Description . This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete, SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. 4 in.) From this we can highlight the following requirements: Visual/ Video Inspection is required on: All Storm Sewer Pipes (100%) Selected Number of Pipe Culverts (>10%) 2016v1.0 Chapter 4 15, 16 Must be done with VDOT Rep Present Conducted no sooner than 30 days after completion of Installation and placement of final cover (except pavement). 0 9) When can No. = 108 in. Backfill material shall be knifed into the area along the bottom edge of the pipe. Dense graded aggregates are used in pavement to give the structure more strength. X, `| Provisions. The moisture content at which a soil begins to behave like a liquid is called the liquid limit. True or false: A soil that contains a high percentage of fines is more affected by water that one with a low percentage of fines. hbbd``b`$BAD`LZ H0j( a2H-q u\?#v#_ xZKs2>Ip P7[Sq9FoLLmJgl~K"5JtB2+!765nt-8\Gf._o{}E Debris in the pipe Coatings free of cracks, scratches and peeling Cracks (longitudinal and circumferential) Spalls and Slabbing For metal and plastic pipe localized buckling, bulging, cracking at bolt holes, flattening, or racking, etc. The cost estimates, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer. Gravity sanitary sewers and appurtenances. The components of an underdrain system are: 1) Trench 2) Non woven geotextile drainage fabric 3) Perforated longitudinal pipe (min. C. Section 014510 TESTING LABORATORY SERVICE. The mandrel shall be fabricated of metal, fitted with pulling rings at each end, stamped or engraved on some segment other than a runner with the nominal pipe/culvert size and mandrel outside diameter. For more information about taking the . STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Care must be exercised to ensure placement and compaction of the embedment material in the haunches. 5) True or False. stream The following is a list of SPECIFICATIONS, which may be related to this section: A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. 19 terms. 1. For assistance printing or verifying your Materials Certifications Report use this click here.