Working Without a Permit If the permittee has been issued a summons/NOV for working without a permit, all future permit requests may be placed on hold until the applicant takes out a permit of record for the work that was performed. MICROSTATION SHEET MODELS. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". Street resurfacing in progress. Work Site Safety All obstructions on the street must be protected by barricades, fencing, railing with flags, lights, and/or signs placed at proper intervals and at prescribed hours in accordance with the most recent version of the Manual on Uniform Traffic Control Devices (MUTCD), published by the Federal Highway Administration, and the New York State Supplement. Tel: (718) 875-7428 The first option (see Diagram 1) is by using the DOT on-line NYCStreets Permit Management system. New York City is brimming with construction activityfrom the building of skyscrapers, rehabilitating and reconstructing of bridges and roadways, to the digging of new subway lines. For building operations, a crane permit is required for all cranes and derricks operating in the street on building construction or related activity under the jurisdiction of DOB, with the exception of truck cranes with telescopic, hydraulic or folding booms, over 50 feet and not more than 135 feet with a maximum rated capacity of 3 tons, for which a construction activity permit has been issued. ------- CONTAINER SHALL NOT BE STORED OR PLACED WITHIN: (I) "NO STOPPING","NO PARKING ANYTIME" OR "AUTHORIZED PARKING" AREAS. This New York 811 marking shows where a cable television line is located beneath the sidewalk. (718)786-8589 OR (718)786-8407, ONE SPEED REDUCER IS LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. ONE 11-FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY, ON WEEKENDS, DEFINED AS 12:01AM SATURDAY THROUGH 6AM MONDAY. Permits that have expired may be reissued only within30 daysof expiration. In some cases, applications and supporting documentation must be submitted in person, however the majority of permit applications may be submitted online. NYC DOT's street reconstruction and resurfacing programs include nearly 6,000 miles of city streets. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . NO WORK CAN OCCUR WITHIN 2 BLOCKS OF AN ACTIVELY OPERATING NYCDDC SITE. PAVEMENT MUST BE RESTORED IN KIND. 1150 Clove Rd. NYCStreets system will automatically block an applicant from submission if insurance is not current. Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. A single PDF of the 619 Standard Sheets is available at the . TO FRI. AND 9AM TO 11 PM SAT. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. After repairs are complete, the property owner can contact 311 to schedule a Sidewalk Violation Dismissal. WALKWAY IN ROADWAY MAY BE CLOSED 8AM- 4:30PM MON - FRI OPEN ALL OTHER TIMES. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. THREE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA.PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. An explanation and description of "Holds" may be found in Section 3.5 Other Provisions Pertaining to Permits of this chapter. LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. Fax: (212) 860-1359 WORK 7 PM - 6 AM WEEKNIGHTS, NO WEEKENDS. All materials used for backfill must be free from bricks, blocks, excavated pavement materials and/or organic material or other debris. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. Information on restoration requirements following street openings/excavations can be found inChapter 4 Executing Work in the Street. The Standard Sheet Books are also available as compiled .pdf files for the critical letting dates for which they were applicable. If the applicant does not accept the permit stipulations, he or she can request a review with the PM. PRIOR TO PERFORMING ANY NON-EMERGENCY WORK WHICH IMPACTS AUTHORIZED PARKING, THE CONTRACTOR SHALL NOTIFY & COORDINATE WITH NYC DOT AUTHORIZED PARKING UNIT AT: BARCLAYS CENTER (ATLANTIC YARDS) EVENTS. (212) 839-8857 While the situation is evolving, the agency remains committed to applying the principles and proven treatments included in the Street Design Manual to support the health and safety of all New Yorkers. APPLICANT SHALL NOT PLACE CONTAINER IN A WAY THAT CONFLICTS WITH OTHER PERMITTED CONSTRUCTION ACTIVITIES ON THE SAME BLOCK. Any emergency work on a street that involves a street opening/excavation requires a Street Opening Permit. In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. NYC DOT project locations, protected streets, and other maps are available online at the Department of Information Technology & Telecommunications (DoITT) NYCityMap website and the DOTMap portal. (212) 442-1890 From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. CGL insurance. NO OCCUPANCY OF ROADWAY OF PERMITTED AFTER WORKING HOURS. Details about the exact holiday embargo dates, times, and locations are posted on NYC DOT's Special Traffic Advisory page, generally in mid-October. For New York City Department of Design and Construction (DDC) capital projects, a CPO hold can only be released by DDC. 120-55 Queens Blvd., Room 201 To request release of a Revenue hold, the permittee must contact NYC DOT's Fiscal Affairs Office to arrange for payment of outstanding bills. Street Design Manual | NYC Street Design Manual The milling and resurfacing schedules are organized by borough and are sent electronically each week to utility companies and other city agencies. Brooklyn, NY 11201 Fax: 718-584-8628, Brooklyn Its overall goals are both far-reaching and vital: sustaining the city's investment in its streets, enhancing access to subsurface infrastructure and minimizing transportation and community disruptions. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). The Protected Streets Listing consists of four separate files, each covering all five boroughs: All streets on the "Active/Future" lists show the anticipated start date of the project. SignageSigns must be displayed at the work site or at 100-foot intervals along a series of excavations or continuous cuts indicating the name of the entity performing the work, the name of the entity for whom the work is being performed and, if applicable, the name(s) of the subcontractor(s). WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. THE CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE THE FINAL RESTORATION STARTS SO THAT HIQA CAN MONITOR THE WORK. FLAGGERS ARE REQUIRED FOR ALL MOVEMENTS IN AND OUT OF SITE AT ALL OTHER TIMES. DO NOT PLACE MATERIALS, TRAILERS, CRANES, CONTAINERS, OR EQUIPMENT IN FRONT OF DRIVEWAYS, BUS STOPS, WITHIN FIFTEEN FEET OF A FIRE HYDRANT, IN AUTHORIZED PARKING ZONES OR BLOCKING ACCESS TO DEP WATER TESTING BOXES. WORK ALLOWED 8 PM TO 6 AM NIGHTLY. Any emergency work on a street that involves opening a utility access cover to gain access to an underground facility on a critical street during restricted hours requires an EAN. All active permits in the affected area(s) are suspended during the dates and times of the embargo period and no new permits may be approved, unless a waiver for the work is granted by OCMC. Tel: (718) 482-4516 This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. Interpreting Parking or Traffic Sign or Regulation Locate Parking Signs on Specific Streets Parking Sign Fact Sheet Parking in a School Zone Parking Rules School Bus Parking THE CONTRACTOR SHALL MAINTAIN (1) EITHER A 5-FOOT CLEAR SIDEWALK FOR PEDESTRIAN ACCESS AT ALL TIMES,(2) A PROTECTED WALKWAY IN THE ROADWAY MEETING ALL NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY OR,(3) A NYCDOB APPROVED PROTECTED WALKWAY THORUGH THE BUILDING. OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. USE OF METERED,AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED. FOR PROJECT COORDINATION PURPOSES, THE PERMITTEE MUST CONTACT THE RESIDENT ENGINEER FOR THE NYCT SECOND AVENUE SUBWAY PROJECT PRIOR TO COMMENCING WORK. A temporary sidewalk closure while a sidewalk repair is underway. CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT. Brooklyn SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. The full list of rules and regulations is contained in the Highway Rules, Sections 2-02 and 2-04, and should be consulted before any work is performed on the street. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR 12"BEYOND FURTHEST CUT TO CURB LINE FOR ALL CUTS AS AGREED TO W ITH THE BOROUGH ASHO'S OFFICE. Fax: 718-556-7305, The Bronx Canopy permits are not transferable from person to person or from the location of original issue. WORK ALSO ALLOWED 10 AM TO 6 PM SATURDAY. CRITERIA & PROTOTYPE FOUND AT: THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB LANE ONLY RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. The second option is available for applicants who do not have the technology to use the above procedure. WORK 7 PM FRIDAY TO 6 AM MONDAY AND 7 PM-6 AM WEEKNIGHTS. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. Tel: (718) 965-7750, Manhattan It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. Non-Freeway, Special, To request release of an STP hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. (718) 391-1937 Long Island City, NY 11101 Click here for a list of current construction embargoes. THIS STIP IS USED FOR SINGLE CUTS IN THE CURB/PARKING LANE. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. Please note that although permits can be submitted, paid for and printed out 24/7, the permit review process occurs only during normal weekday Permit Office hours. Parking Signs and Rules NYC311 - Government Of New York City Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. Long Island City, NY 11101 New York, NY 10007 PERMITTEE MAY BE REQUIRED TO REMOVE CONTAINER IMMEDIATELY UPON NOTIFICATION BY NYCDOT OR AUTHORIZED GOVERNMENT EMPLOYEE. If the insurance is not current, the request will be denied. The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. FULL INTERSECTION RESTORATION WILL BE REQUIRED WHEN MORE THAN 50% OF THE INTERSECTION IS EXCAVATED. 619 Work Zone Traffic Control - New York State Department Of Transportation NO NOISY OPERATIONS BETWEEN 12:01 AM AND 7:00AM. THE SIGN MUST BE PLACED AT A HEIGHT OF 7 TO 10 FEET AND STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF THE CLOSURE. Customer Service: (718) 286-0600, Staten Island NO WORK ON JULY 12, 2005. Fax: 212-720-3488, Queens All addresses must be the same on all above referenced documents. Listed in the table are the most commonly requested Building Operations/Construction Activity Permit types, which may be used when completing an application. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. Applications for renewal of a canopy maintenance permit must be made at least one month prior to the permit expiration date and must be submitted to the Permit Office in the borough in which the canopy is located. The fee for reissuance may be found in Section 2-03 of the Highway Rules. ). NYC Parks & Recreation It draws from a wide range of resources and experience to present a coherent set of choices for street design. OCCUPY 15 FEET OF E/S CURB LANE. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. For hearings, Monday to Friday from 8:30 AM to 3:30 PM. IF MULTIPLE LANES ON GOWANUS IN SAME DIRECTION AS MILLING, NO MILLINGY WORK MAY OCCUR. 1 Centre Street, 9th Floor An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. Applications for NYC DOT vault permits are reviewed on a case-by-case basis. APPROVAL FROM NYCDOT HIQA BOROUGH OFFICE IS REQUIRED BEFORE WORK COMMENCES. Fax: 718-286-3183, Staten Island WORK 7PM TO 11PM MON. Canopy permits are generally taken out by building owners, business owners, and canopy installers. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. THIS PERMIT IS BEING ISSUED WITH UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BLOCK SEGMENT CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Check traffic advisories. In Chapters 3 and 4, the symbol is used to indicate particularly time-sensitive requirements of the processes described. WAIVER TO WORK DURING 2010 HOLIDAY EMBARGO GRANTED FOR THIS PERMIT. Transverse SlopeSidewalks must be laid to pitch from the building line toward the curb. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. NYC DOT authorization is required before installing a canopy over the sidewalk. A separate Occupancy of Sidewalk Permit is required if a minimum of 5 feet cannot be maintained on the sidewalk for unobstructed pedestrian passage. While the files are presented here in .pdf format, the source drawings are actually produced as MicroStation .dgn files. OF BRIDGES: UPON INITIAL INSTALLATION OF A CANOPY, THE PERMIT TO MAINTAIN A CANOPY SHALL BE PLACED ON HOLD UNTIL A FINAL INSPECTION DETERMINES CANOPY WAS INSTALLED AS PER SUBMITTED PLANS. 30-30 Thomson Avenue, 4th Floor ALL OVERDIMENSIONAL CRANE/TRAILERS REQUIRE AN ADDITIONAL PERMIT FROM THE NEW YORK CITY DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES. FULL WIDTH OF SIDEWALK AND ROADWAY MUST BE RESTORED AFTER WORKING HOURS. The streets themselves also serve as public spaces, fostering social, economic and recreational activities. Kew Gardens, NY 11424 To request release of the hold, the permittee must take out a permit of record for the work that was performed without a permit and then contact HIQA to submit a copy of the permit. Bridge (BOB) hold Any planned work requiring a Building Operations/ Construction Activity Permit that may potentially be within 100 feet of a bridge structure will be placed on a Bridge hold. MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. Plan Examination Unit Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. 120-55 Queens Boulevard, Ground Floor, Room G-210 Fax: (718) 858-0069, Manhattan (212) 748-6670 MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. MUST TINT CONCRETE TO MATCH ASPHALT. The Bronx RESTORATION OF ROADWAY WHICH HAS GREEN COLORED BIKE LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF GREEN # 105953 RIDE-A-WAY COATING MATER'L MFG'D BY FLINT TRADING INC OR EQUIVALENT. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. Chief Plan Review Section, DEP/BWSO (718) 595-5191, New York City Fire Department (FDNY) The pedestal is monolithically poured with the foundation. Tel: 212-720-3300 This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. Registration applications should be printed on 8 1/2"x 14" paper. Moreover, the Third Edition is available onlineto increase the reach and accessibility of this essential reference document. - see, UTILITY COVER EMBARGO 0700-1000 1600-2000 WEEKDAYS, UTILITY COVER EMBARGO 0700-1000 1600-1900 WEEKDAYS, UTILITY COVER EMBARGO/HOLIDAY EMBARGO 0600-2400 WEEKDAYS/WEEKENDS. 311 (or 212-NEW-YORK outside the City) All links are subject to change. THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. New York, NY 10007 Form must be notarized. 24 West 61st St., 5th Fl. A SEPARATE 221 PERMIT IS NOT REQUIRED FOR CAPITAL/GOVT PROJECTS. Borough Permit OfficesIn-person applications for all other construction-related work can be submitted to the borough office in the borough in which the work is to be performed. AND SUN. Attn: Forestry SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Applicant should submit this form with the appropriate documentation and waiver request fee. DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. 8:30 AM to 4:30 PM, South Queens (south of the LIE) These include major construction related projects or planned traffic enhancements (e.g., Second Avenue subway, bus rapid transit, water tunnel route), or where there are significant traffic issues (e.g., thru streets, exits and entrances to major tunnels and bridges). New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . CPO holds will typically be released by DDC if the proposed work does not interfere with its schedule. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. A Sidewalk Violation will be removed if the work has been satisfactorily completed. FULL CORNER QUADRANT RESTORATION IS REQUIRED FOR ALL CORNER QUADRANTS EXCAVATED. DURING NON-WORKING HOURS PEDESTRIAN WALK WAY MUST BE MAINTAINED ON SIDEWALK OR ON ROADWAY. Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. NO LANE CLOSURES PERMITTED TWO HOURS PRIOR TO BARCLAYS CENTER EVENTS THROUGH TWO HOURS AFTER THE EVENT HAS ENDED. WORK 9 PM TO 6 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH TO TRAFFIC WHEN SITE IS UNATTENDED. The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. For complete NYC DOT requirements regarding the performance of work in the street, please consult the Highway Rules and NYC DOT specifications. SIGNS SHALL BE POSTED IN ACCORDANCE WITH FEDERAL M.U.T.C.D.MANUAL. As of August 31, 2017, a new Holiday Embargo (HE) review process has replaced the previously used HE waiver request process used by NYCSTREETS. The central Permit Office accepts money orders, company checks, certified checks and most major credit cards as payment for permit fees. DOB approval is also required. Street Opening Permits are required for excavations or other work in a city street that disturbs the street surface. WORK SATURDAY AND SUNDAY. COORD. 120-55 Queens Boulevard, 1st floor, Room 1-240 NYC DOT coordinates street opening and other construction on streets. CONNECT WITH US. For design criteria, technical information, finishes, and color specification, refer to DOTs Bureau of Traffic Operations, Division of Street Lighting specifications. ODTRES-RESTORE AS PER SKETCH#10 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Applicants must submit a completed permit application. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). NYC DOT has a separate procedure for obtaining authorization for emergency utility access cover openings so that applicants can expeditiously perform such work. Applicants who prefer to apply in person may do so using an Application for Roadway/Sidewalk Permit(s)or seeAppendix B, Forms. IF MORE THAN 50% OF THE SIDEWALK FRONTAGE IS AFFECTED THE ENTIRE SIDEWALK MUST BE REPLACED WITH THE NEW 4.13C STANDARD. In addition, the streets serve as the access point for the subsurface infrastructure that provides water, sewer, power, and telecommunications services for the city.